TTPC's Perlis Power Plant is a 650MW combined cycle power plant located in Perlis, Malaysia. The plant achieved its Commercial Operation Date (COD) on 31st March 2003.
Average reliability since commissioning with only 1% forced outage rate.
Achieved the highest availability among all combined cycle power plants in Malaysia.
Optimised productivity with load factor of over 80%.
| Year | Availability (%) | Reliability (%) | Load Factor (%) |
|---|---|---|---|
| 2013 | 95.2 | 99.1 | 82.5 |
| 2014 | 94.8 | 98.9 | 81.2 |
| 2015 | 95.5 | 99.2 | 83.1 |
| 2016 | 94.9 | 98.8 | 80.8 |
| 2017 | 95.3 | 99.0 | 82.3 |
| 2018 | 95.1 | 98.9 | 81.5 |
The plant utilizes advanced gas turbine technology for efficient power generation with quick start-up capabilities.
Waste heat from gas turbines is captured to generate steam, maximizing thermal efficiency.
Steam generated from HRSG drives the steam turbine for additional power generation.